Futan Machiney

Latest News

CONTACT US

Tel/Fax:+86-21-65679836
Mobile/WhatsApp£º+86-18121356587
E-mail:info@blessworth.com
           victoria@blessworth.com
Skype 1£ºblessworth
Skype 2 : jpbiz_export
Youtube Channel:
https://www.youtube.com/user/bulkworth/videos
Address: Room 1611B 16/F,
HO KING COMM CTR,
2-16 FA YUEN ST. MONGKOK
KLN HONGKONG
Shanghai Office: No.135 GUONIAN ROAD, 
YANGPU DISTRICT, SHANGHAI, 200433, 
P.R. China

Technical Information

You are the position of:Home > NEWS > Technical Information
Maintenance Requirement for Ultrasonic Quilting Machine
Author:Skype:blessworth Posted on:2014-07-17 10:00:00 Hits:

Maintenance Requirement for Ultrasonic Quilting Machine

1. Lubricate the bearings of the pattern roller and rubber roller.
2. Whenever there is something abnormal in operation, shut down the machine in time. 
When shutting down the machine, remmenber to shut down the generator first and then the motor.
3. One hour break is needed after the machine has run for 8 hours.
 
Cautions
1. Preheating is necessary before the machine begins to work.Turning on the generators and pressing the test button 
to warm up the machine for several minutes before the machine begins to work.
2. It is prohibited to disassemble the generator unit.
3. When you get the ultrasonic quilting machine, all the ultrasonic generators are adjusted well before they go out of
 the factory. It is prohibited to change them. Any random change may cause damage to the relevant parts.
4. Electric cabinet should be grounded for the safety.
5. It is prohibited to load the material manually when the machine is on running condition.



Previous:Maintenance Requirement for Ultrasonic Sewing Machine

Next:Process of Non-woven Bag Making Manually